वाष्प टरबाइनŠkoda Plzeň
Turbogenerator set 25MW
वाष्प टरबाइन
Škoda Plzeň
Turbogenerator set 25MW
EXW VB कर के अतिरिक्त
€17,00,000
निर्माण वर्ष
1995
स्थिति
उपयोग किया हुआ
स्थान
चेक गणराज्य 

तस्वीरें दिखाती हैं
मानचित्र दिखाएँ
मशीन के बारे में जानकारी
- मशीन का नाम:
- वाष्प टरबाइन
- निर्माता:
- Škoda Plzeň
- निर्माण वर्ष:
- 1995
- स्थिति:
- उपयोग किया हुआ
- कार्यक्षमता:
- पूरी तरह से कार्यरत
- प्रचालन घंटे:
- 2,01,000 h
मूल्य और स्थान
EXW VB कर के अतिरिक्त
€17,00,000
- स्थान:
- 117, Vratimovská 689, 719 00 Slezská Ostrava, Czechia
कॉल करें
तकनीकी विवरण
- दबाव:
- 19 छड़
- शक्ति:
- 25,000 किलोवाट (33,990.50 एचपी)
- आवृत्ति:
- 50 Hz
- तापमान:
- 320 °C
- कुल वजन:
- 93,000 किग्रा
- अधिकतम घूर्णन गति:
- 3,000 आरपीएम
- कुल लंबाई:
- 6,200 मिमी
- शीतलन प्रकार:
- पानी
प्रस्ताव का विवरण
- विज्ञापन आईडी:
- A19313656
- संदर्भ संख्या:
- TG3
- अद्यतन:
- अंतिम बार 06.06.2025 को
विवरण
Škoda Plzeň, Turbogenerator set, condensate steam turbine 25 MW
Manufacturer: Škoda Plzeň
Power: 25 000 kW
Type:
RPM: 3000/ min
Steam pressure: 19 bar
Steam temperature: 320 ºC
Number of Extractions:1+3
Operation hours: 201000
The equipment is from year 1995 and has received all maintenance required for the maximum reliability, availability and capacity.
Chjdpfx Aswqp U Eofzjc
Size: 4 700 x 6 200 mm,
Weight: 93 000
Generator, gearbox, condenser, condenser pumps, oil system and all related electro and InC equipment included.
We will send all technical data on request.
The machine has been regularly maintained and serviced since its commissioning. GO and SO have been carried out at intervals of about 5 years according to the actual condition. GO was carried out by the turbine manufacturer. The last GO was carried out in 2017 for a total amount of 112.6 million CZK. The following repairs were carried out:
- replacement of the old rotor with a new one,
- repair of the flow section of the stator and the distributor wheels and supports,
- replacement of the gearbox,
- repair of the regulation, oil. Repair of the system, condensation,
- installation of irrigation and new NZ,
Maintenance and servicing was carried out in the years after the GO, the inspection for subsequent repair was planned for 2024 and did not take place.
Manufacturer: Škoda Plzeň
Power: 25 000 kW
Type:
RPM: 3000/ min
Steam pressure: 19 bar
Steam temperature: 320 ºC
Number of Extractions:1+3
Operation hours: 201000
The equipment is from year 1995 and has received all maintenance required for the maximum reliability, availability and capacity.
Chjdpfx Aswqp U Eofzjc
Size: 4 700 x 6 200 mm,
Weight: 93 000
Generator, gearbox, condenser, condenser pumps, oil system and all related electro and InC equipment included.
We will send all technical data on request.
The machine has been regularly maintained and serviced since its commissioning. GO and SO have been carried out at intervals of about 5 years according to the actual condition. GO was carried out by the turbine manufacturer. The last GO was carried out in 2017 for a total amount of 112.6 million CZK. The following repairs were carried out:
- replacement of the old rotor with a new one,
- repair of the flow section of the stator and the distributor wheels and supports,
- replacement of the gearbox,
- repair of the regulation, oil. Repair of the system, condensation,
- installation of irrigation and new NZ,
Maintenance and servicing was carried out in the years after the GO, the inspection for subsequent repair was planned for 2024 and did not take place.
आपूर्तिकर्ता
सूचना: निःशुल्क पंजीकरण करें या लॉगिन करें, सभी जानकारी प्राप्त करने के लिए।
से पंजीकृत: 2025
अनुरोध भेजें
टेलीफ़ोन & फैक्स
+420 370 ... विज्ञापन
हो सकता है ये विज्ञापन भी आपकी रुचि के हों।
छोटा विज्ञापन

6,191 km
वाष्प टरबाइन
Škoda PlzeňTurbogenerator set 25MW
Škoda PlzeňTurbogenerator set 25MW
आपका विज्ञापन सफलतापूर्वक हटाया गया है
एक त्रुटि हुई है